Given the following results from a product

risk analysis

Loading

Choose the correct option.

Given the following results from a product

risk analysis that occurred at the beginning of an iteration:
• User story 1 (Performance): likelihood: high, impact: high

• User story 2 (Security): likelihood: high, impact: high

• User story 3 (Functional): likelihood: medium, impact: high

• User story 4 (Functional): likelihood: high, impact: medium

• User story 5 (Compatibility): likelihood: low, impact: low

• User story 6 (Recoverability): likelihood: low, impact: low

Which TWO of the following describes best what the team should do with this information?Select TWO options.

A. Move onto planning poker session to estimate effort for user stories,

and determine what can be done in the current iteration, and what needs

to be added to backlog.
B. Remove user stories 5 and 6 from the current iteration and move to a later iteration.
C. Because of the number of high likelihood, high impact risks slotted for

this iteration, the team has no choice but to extend the timeframe of

the iteration by 2 weeks.
D. The team should collaborate on effective ways to mitigate the high likelihood, high impact risks.