Some of the common problems of test automation are
Practice ISTQB Foundation Level Q&A – Some of the common problems of test automation are
Practice ISTQB Foundation Level Q&A – Some of the common problems of test automation are
Practice ISTQB Foundation Level Q&A – What are the main attributes of test automation
(1) Time saving
(2) Correctness
(3) Less Manpower
(4) More reliable
Practice ISTQB Foundation Level Q&A – The selection of test cases for regression testing
Practice ISTQB Foundation Level Q&A – What are the key features to be concentrated upon when doing a testing for world wide web sites
Practice ISTQB Foundation Level Q&A – Which of the following approach needs to be
taken if there are a large number of defects being found in the
software?
(1) Try continuing testing and logging the critical defects.
(2) Immediately stop testing the product.
(3) Inform the lead/manager providing proper documentation
(4) Continue testing in the normal manner
Practice ISTQB Foundation Level Q&A – Which one of the following need not be part of the bug tracker?
Practice ISTQB Foundation Level Q&A – Feasibility study is more imoprtant before load testing
Practice ISTQB Foundation Level Q&A – Which of the following is not a client side statistics in load testing
Practice ISTQB Foundation Level Q&A – The extent of automation for a given project is generally guided by
Practice ISTQB Foundation Level Q&A – If Quality Control and Quality Assurance are compared
Practice ISTQB Foundation Level Q&A – Verification performed without any executable code is referred to as
Practice ISTQB Foundation Level Q&A – What is the concept of introducing a small
change to the program and having the effects of that change show up in
some test?
Practice ISTQB Foundation Level Q&A – In a V-model of software testing, UAT plans are prepared during the
Practice ISTQB Foundation Level Q&A – Per economics of testing โ optimum test is suggested because
Practice ISTQB Foundation Level Q&A – Test efficiency is always directly proportional to