Bug life cycle (1M)
Practice ISTQB Foundation Level Q&A – Bug life cycle (1M)
Practice ISTQB Foundation Level Q&A – Bug life cycle (1M)
Practice ISTQB Foundation Level Q&A – Which is not the testing objectives (1M)
Practice ISTQB Foundation Level Q&A – Which of the following is the standard for the Software product quality (1M)
Practice ISTQB Foundation Level Q&A – A _____ is the step-by-step method followed to ensure that standards are met(2M)
Practice ISTQB Foundation Level Q&A – ________ and ________ are used within individual workbenches to produce
the right output products. (2M)
Practice ISTQB Foundation Level Q&A – Poor software characteristics are (3M)
Practice ISTQB Foundation Level Q&A – Which is not the project risks (2M)
Practice ISTQB Foundation Level Q&A – The purpose of exit criteria is (2M)
Practice ISTQB Foundation Level Q&A – ________________ testing is performed at the developing organizationโs site(1M)
Practice ISTQB Foundation Level Q&A – Use cases can be performed to test (2M)
Practice ISTQB Foundation Level Q&A – ___________ technique can be used to achieve input and output coverage (1M)
Practice ISTQB Foundation Level Q&A – Purpose of test design technique is (1M)
Practice ISTQB Foundation Level Q&A – What is the main purpose of Informal review (2M)
Practice ISTQB Foundation Level Q&A – Who is responsible for document all the issues, problems and open point that
were identified during the review meeting (2M)
Practice ISTQB Foundation Level Q&A – Which is the non-functional testing (1M)